302) Pick up the incorrect statement from the following. A critical ratio scheduling
Answer is:
none of the above.
Related Production and Industrial Engineering MCQ with Answers
Answer is:
all of the above.
Explanation:
PERT is
* an analytic tool in concept
* limit up of event oriented diagrams
* used for research and development projects
Answer is:
all of the above.
Explanation:
CPM is
* synthesising in concepts
* is built of activities oriented programmes
* is, based on one time estimate
Answer is:
all of the above.
Explanation:
A CPM family includes
* CPA (Critical Path Analysis)
* CPP (Critical Path Plotted)
* MCE (Minimum Cost Expenditure)
Answer is:
all of the above.
Explanation:
PERT/CPM, techniques can be used for following
* once through project
* maintenance jobs
* research and development